KATHMANDU, AUGUST 4
Flooded Feme rivulet, which flows through Fidim Municipality, has caused damages in multiple areas. The monsoon-rain triggered flood in the rivulet has risked the bridge over the Feme rivulet, on Fidim-Falot road. Perpetual erosion of land in the western part has rendered the 25-metre-long bridge vulnerable.
Flood has swept away over half portion of the land across the main pillar increasing the risk to the bridge infrastructure.
Likewise, landslides caused by the flood-fed rivulet around the bridge and at Fidim Municipality-1 and Malbanse have obstructed the Fidim-Falot road section.
The municipality has been trying to clear the landslide debris from the road.
Landslide at Fidim-7 has halted traffic along the Fidim-Ranitar-Lungrupa road section. The municipality and locals are putting their efforts to resume the traffic operation.
The flood-fed Feme rivulet has also damaged three micro-hydro projects at Fidim. The power generation from the projects has come to a halt with the flood sweeping away the projects’ pipelines.
Continuous floods have caused damages to Feme rivulet micro-hydropower project and other two projects of BK hydropower, said chief of the District Police Office Panchthar, DSP Siddharaj Neupane.
The post Flood damages hydropower projects, bridge appeared first on The Himalayan Times.
No comments:
Post a Comment